Fri 5-6-2016. Help Sign Shop. Eleven more stanchions, 4 A-signs, 20 "Prohibited Items" signs.

Help Moving Crew. Surplus to forklift from second story.


Thu 5-5-2016. Help Sign Shop. Make 11 more stanchions. Install crosswalk signs along Emmet at Sprigg, Thompson, Central Grounds Parking Garage, along Jeanette at Lane and Nursing School, and on Crispell.


Wed 5-4-2016. Help Sign Shop. Make 11 more stanchions. Install crosswalk signs along Rugby, Culbreth, Alderman, Whitehead roads.


Tue 5-3-2016. Help Sign Shop prepare for graduation. Make 11 more stanchions.

Heating Plant Vivarium steam tunnel. Clean up, patch damaged asbestos pipe insulation.

Help Moving Shop. Pick up, deliver, surplus various furniture Carruthers, Medical Center, Old Towers, office in Bellair.

Bulletin board.


Mon 5-2-2016. Chark Hall addition roof top. Discard the filters. Haul away equipment, vacuums.

Madison Hall 108 Kitchenette. Floor tile / mastic.

Madison Hall 109 Copy Room. Vacuum.


Upcoming Jobs

(Postponed: Fri 5-6-2016. Zehmer Hall cracked window glazing.)

Mon 5-9-2016. Thornton Hall roof. Postponed twice due to weather.

5 a.m. Shutdown Sat 5-14-2016.

Thu 4-7-2016. Steam Tunnel 16 Points at Garrett/Batten sidewalk above McIntire Amphitheater. For 5 a.m shutdown Sat May 14. Go down ladder, turn around to face amphitheater. Right a few steps is A. From A go left a hundred feet to B. From A go right hundred feet to C where the tunnel splits. (A) Remove asbestos pipe insulation, tar paper, tie wires from major steam line using over-sized glovebags. Patch at least one open end. Linear feet 6 1/2. Circumference 5 feet 4 inches. (B) 2 medium lines a couple feet. 1 small line 8 ft. Patch exposed asbestos insulation. (C) Patch/repair/clean up working area near where flashlight shines. Might not be asbestos. Okay to sample. Still wants the cleanup. A and B must be completed at the same time so next crew can enter. Glovebags should be hung and preparations the day before. C must be completed prior to day of shutdown.

Mon 5-23-2016. Day off after graduation and 7+ days of 12+ hours. Scheduled off since last year.


1st Week May 2 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa  | Su  = 40 Hour Work Week.

1st Week May 2 || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa  | Su  = No correction.

2nd Week May 9 || M  | T  | W  | Th  | F  || Sa  | Su  = 

2nd Week May 9 || M  | T  | W  | Th  | F  || Sa  | Su  = 


1st Week Apr 18th || M 9 | T 8 | W 8 | Th 2 | F 0 = 1 OT | 14 UL.

1st Week Correct  || M 8 | T 8 | W 8 | Th 3 | F 0 = 13 UL.

2nd Week Apr 25th || M 8 | T 8 | W 8 | Th 7 | F 7.5 || Sa 4  = 1.5 UL | 4 OT.

2nd Week Correct  || M 8 | T 8 | W 8 | Th 8 | F 8 || Sa 2.5 = 2.5 OT.

Template. Explanation Week 29.

Week || M  | T  | W  | Th  | F  || Sa  | Su  = 


Home | Training | Week 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 | 18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 9 | 8 | 7 | 6 | 5 | 4 | 3 | 1&2 | Archives