Fri 6-3-2016. MR-4 Rm 1035. Carpet / tile / asbestos mastic. More lead in the walls.

Jordan 3-93. Drop off HEPA vac, disposal bags, poly, red tape for plumbers.


Thu 6-2-2016. MR-4 Rm 1035. Demolish old X-ray room with lead in the walls. Recycle 2,700 pound of lead.


Wed 6-1-2016. Sick day.


Tue 5-31-2016. Medical Center Emergency Entrance. Help sign shop install 2 signs and modify third on right.

Old Medical School MED 3789, third floor straight out to Hospital Dr. Above drop ceiling patch 5 areas of frazzled, damaged asbestos pipe insulation. Vacuum tops of ceiling tile.

Private Clinics CDW 2614. Remove HEPA vac. Plumbing repair appears complete.

Alderman Library 2nd floor uitility room. Clean up elbow of damaged asbestos pipe insulation.


Mon 5-30-2016. Memorial Day paid holiday.


Payday 6-17.

1st Week May 30 || M 8 | T 8 | W 0 | Th 8 | F 8 || Sa  | Su  = 8 UL.

1st Week May 30 || M 8 | T 8 | W 0 | Th 8 | F 8 || Sa  | Su  = No correction.

2nd Week Jun 6 || M  | T  | W  | Th  | F  || Sa  | Su  = 

2nd Week Jun 6 || M  | T  | W  | Th  | F  || Sa  | Su  = 

Payday 6-3.

1st Week May 16 || M 8 | T 9.5 | W 12 | Th 11 | F 11.5 || Sa 11 | Su 11 = 34 OT.

1st Week May 16 || M 8 | T 9.5 | W 12 | Th 11 | F 11.5 || Sa 11 | Su 11 = 34 OT.

2nd Week May 23 || M 8 | T 8 | W 8 | Th 4 | F 0 || Sa 0 | Su 0 = 12 UL.

2nd Week May 23 || M 8 | T 8 | W 8 | Th 4 | F 0 || Sa  | Su  = No correction.

The correction occurs only when leave and overtime occur in the same week, not 2-week pay period. If it did, I would opt for keeping the 12 hours UL and getting only 22 hours OT. Explanation Week 29.